MISO request J3006

MISO queue ID J3006

Queue request J3006 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW battery project in Milwaukee County, WI, according to Berkeley Lab’s queue data file. The filing names Granville345kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDJ3006
Project nameNot reported
Status (as published)Active
SubstationGranville345kV Substation
Point of interconnectionGranville345kV Substation
CountyMilwaukee
StateWI
Voltage345 kV
Capacity300 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Milwaukee, WI: 3 requests in the MISO queue, 3 active totaling 2,738 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP-2022 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2025-07-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.