Substation Scout

MISO request J3004

MISO queue ID J3004

Queue request J3004 was listed in the MISO interconnection queue at the end of 2025 as a 142 MW hybrid project in Mason County, IL, according to Berkeley Lab’s queue data file. The filing names Cane as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 30, 2025.

Queue IDJ3004
Project nameNot reported
Status (as published)Active
SubstationCane
Point of interconnectionCane
CountyMason
StateIL
VoltageNot reported
Capacity142 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-08-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cane substation: 2 requests in the MISO queue, 1 active totaling 142 MW.

Queue IDProjectMWResourceStatus
J2635Not reported52SolarWithdrawn

Mason, IL: 17 requests in the MISO queue, 8 active totaling 1,432.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 142 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first