Substation Scout

MISO request J2982

MISO queue ID J2982

Queue request J2982 was listed in the MISO interconnection queue at the end of 2025 as a 35 MW solar project in Warren County, IL, according to Berkeley Lab’s queue data file. The filing names Line Monmouth Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2023.

Queue IDJ2982
Project nameNot reported
Status (as published)Active
SubstationLine Monmouth Switching Station
Point of interconnectionLine 6629 Monmouth 69 kV Switching Station
CountyWarren
StateIL
Voltage69 kV
Capacity35 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Warren, IL: 2 requests in the MISO queue, 1 active totaling 35 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.