MISO request J2947

MISO queue ID J2947

Queue request J2947 was listed in the MISO interconnection queue at the end of 2025 as a 205 MW gas project in Rock County, WI, according to Berkeley Lab’s queue data file. The filing names Rock River Substations 1 (6 RICE) and 2 (5 RICE) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2026.

Queue IDJ2947
Project nameNot reported
Status (as published)Active
SubstationRock River Substations 1 (6 RICE) and 2 (5 RICE)
Point of interconnectionRock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)
CountyRock
StateWI
Voltage138 kV
Capacity205 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2026-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rock, WI: 26 requests in the MISO queue, 15 active totaling 2,594.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP-2022 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.