MISO request J285

MISO queue ID J285

Queue request J285 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW wind project in O'brien County, IA, according to Berkeley Lab’s queue data file. The filing names Proposed O'Brien County substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2017.

Queue IDJ285
Project nameNot reported
Status (as published)Operational
SubstationProposed O'Brien County substation
Point of interconnectionProposed O'Brien County 345kV substation
CountyO'brien
StateIA
Voltage345 kV
Capacity250 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2017-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

O'brien, IA: 6 requests in the MISO queue, 2 active totaling 750 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2013-05-20
Interconnection agreement date2016-05-09
Operational date2017-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.