Queue request J2455 was listed in the MISO interconnection queue at the end of 2025 as a 92 MW battery project in La Crosse County, WI, according to Berkeley Lab’s queue data file. The filing names FRENCH ISLAND as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2026.
| Queue ID | J2455 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | FRENCH ISLAND |
| Point of interconnection | FRENCH ISLAND |
| County | La Crosse |
| State | WI |
| Voltage | Not reported |
| Capacity | 92 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2026-09-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
La Crosse, WI: 1 request in the MISO queue, 1 active totaling 92 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2022 West |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-15 |