Substation Scout

MISO request J241

MISO queue ID J241

Queue request J241 was listed in the MISO interconnection queue at the end of 2025 as a 3.7 MW hydro project in Florence County, WI, according to Berkeley Lab’s queue data file. The filing names Twin Falls Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2016.

Queue IDJ241
Project nameNot reported
Status (as published)Operational
SubstationTwin Falls Substation
Point of interconnectionTwin Falls Substation
CountyFlorence
StateWI
VoltageNot reported
Capacity3.7 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2016-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Florence, WI: 1 request in the MISO queue, 1 active totaling 3.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG East (ATC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2012-04-02
Interconnection agreement date2013-05-08
Operational date2016-07-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first