Substation Scout

MISO request J2227

MISO queue ID J2227

Queue request J2227 was listed in the MISO interconnection queue at the end of 2025 as a 89 MW solar project in Trempealeau County, WI, according to Berkeley Lab’s queue data file. The filing names Independence - Bridge Creek as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2024.

Queue IDJ2227
Project nameNot reported
Status (as published)Active
SubstationIndependence - Bridge Creek
Point of interconnectionIndependence - Bridge Creek 69.0kV
CountyTrempealeau
StateWI
Voltage69 kV
Capacity89 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Trempealeau, WI: 4 requests in the MISO queue, 1 active totaling 89 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDAIRYLAND POWER COOPERATIVE
ClusterDPP-2021 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2025-07-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first