MISO request J2173

MISO queue ID J2173

Queue request J2173 was listed in the MISO interconnection queue at the end of 2025 as a 396 MW hybrid project in Hinds County, MS, according to Berkeley Lab’s queue data file. The filing names BOLTON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2027.

Queue IDJ2173
Project nameNot reported
Status (as published)Active
SubstationBOLTON
Point of interconnectionBOLTON
CountyHinds
StateMS
VoltageNot reported
Capacity396 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hinds, MS: 16 requests in the MISO queue, 4 active totaling 1,402.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-08-23
Interconnection agreement date2025-11-19
Components (hybrid)Solar 396 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.