MISO request J2127
MISO queue ID J2127
Queue request J2127 was listed in the MISO interconnection queue at the end of 2025 as a 172.5 MW hybrid project in Jefferson Davis County, MS, according to Berkeley Lab’s queue data file. The filing names Silver Creek as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2027.
| Queue ID | J2127 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Silver Creek |
| Point of interconnection | Silver Creek 115kV |
| County | Jefferson Davis |
| State | MS |
| Voltage | 115 kV |
| Capacity | 172.5 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2027-07-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jefferson Davis, MS: 1 request in the MISO queue, 1 active totaling 172.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | COOPERATIVE ENERGY |
|---|---|
| Cluster | DPP-2021 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2021-08-23 |
| Interconnection agreement date | 2025-12-08 |
| Components (hybrid) | Solar 172.5 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.