MISO request J2127

MISO queue ID J2127

Queue request J2127 was listed in the MISO interconnection queue at the end of 2025 as a 172.5 MW hybrid project in Jefferson Davis County, MS, according to Berkeley Lab’s queue data file. The filing names Silver Creek as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2027.

Queue IDJ2127
Project nameNot reported
Status (as published)Active
SubstationSilver Creek
Point of interconnectionSilver Creek 115kV
CountyJefferson Davis
StateMS
Voltage115 kV
Capacity172.5 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jefferson Davis, MS: 1 request in the MISO queue, 1 active totaling 172.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCOOPERATIVE ENERGY
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-08-23
Interconnection agreement date2025-12-08
Components (hybrid)Solar 172.5 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.