Substation Scout

MISO request J1651

MISO queue ID J1651

Queue request J1651 was listed in the MISO interconnection queue at the end of 2025 as a 149.5 MW solar project in Logan County, IL, according to Berkeley Lab’s queue data file. The filing names Howlett as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2023.

Queue IDJ1651
Project nameNot reported
Status (as published)Active
SubstationHowlett
Point of interconnectionHowlett
CountyLogan
StateIL
VoltageNot reported
Capacity149.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Logan, IL: 11 requests in the MISO queue, 5 active totaling 561.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2020 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2020-06-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.