MISO request J1573

MISO queue ID J1573

Queue request J1573 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW solar project in Portage County, WI, according to Berkeley Lab’s queue data file. The filing names Plover as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2026.

Queue IDJ1573
Project nameNot reported
Status (as published)Active
SubstationPlover
Point of interconnectionPlover
CountyPortage
StateWI
VoltageNot reported
Capacity250 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Portage, WI: 18 requests in the MISO queue, 6 active totaling 1,945.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP-2020 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2020-06-22
Interconnection agreement date2024-02-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.