Substation Scout

MISO request J1558

MISO queue ID J1558

Queue request J1558 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Pope County, AR, according to Berkeley Lab’s queue data file. The filing names MORELAND as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2026.

Queue IDJ1558
Project nameNot reported
Status (as published)Active
SubstationMORELAND
Point of interconnectionMORELAND
CountyPope
StateAR
VoltageNot reported
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pope, AR: 5 requests in the MISO queue, 3 active totaling 600 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2020 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2020-06-18
Interconnection agreement date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first