MISO request J1470

MISO queue ID J1470

Queue request J1470 was listed in the MISO interconnection queue at the end of 2025 as a 30 MW wind project in Benton County, IN, according to Berkeley Lab’s queue data file. The filing names Cayuga CT Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 21, 2023.

Queue IDJ1470
Project nameNot reported
Status (as published)Active
SubstationCayuga CT Substation
Point of interconnectionCayuga CT 345kV Substation
CountyBenton
StateIN
Voltage345 kV
Capacity30 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2023-03-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Benton, IN: 16 requests in the MISO queue, 8 active totaling 960 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP-2019 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2019-04-29
Interconnection agreement date2023-03-21
Operational date2020-12-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first