MISO request J1437
MISO queue ID J1437
Queue request J1437 was listed in the MISO interconnection queue at the end of 2025 as a 180 MW wind project in Carroll County, AR, according to Berkeley Lab’s queue data file. The filing names AECC Dry Creek Switchyard Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2024.
| Queue ID | J1437 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | AECC Dry Creek Switchyard Station |
| Point of interconnection | AECC Dry Creek 161kV Switchyard Station |
| County | Carroll |
| State | AR |
| Voltage | 161 kV |
| Capacity | 180 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2024-05-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Carroll, AR: 2 requests in the MISO queue, 1 active totaling 180 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ARKANSAS ELECTRIC COOPERATIVE CORPORATION |
|---|---|
| Cluster | DPP-2019 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA Complete; Post GIA Status: Under Construction |
| Queue date | 2019-04-29 |
| Interconnection agreement date | 2021-12-22 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.