MISO request J143

MISO queue ID J143

Queue request J143 was listed in the MISO interconnection queue at the end of 2025 as a 40 MW coal project in Ontonagon County, MI, according to Berkeley Lab’s queue data file. The filing names ATC White Pine Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDJ143
Project nameNot reported
Status (as published)Operational
SubstationATC White Pine Substation
Point of interconnectionATC White Pine 69 kV Substation
CountyOntonagon
StateMI
Voltage69 kV
Capacity40 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ontonagon, MI: 2 requests in the MISO queue, 1 active totaling 40 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Feasibility
Queue date2010-06-23
Interconnection agreement date2011-03-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.