MISO request J1304
MISO queue ID J1304
Queue request J1304 was listed in the MISO interconnection queue at the end of 2025 as a 65 MW solar project in Rock County, WI, according to Berkeley Lab’s queue data file. The filing names Paddock - Townline Road Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 11, 2023.
| Queue ID | J1304 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Paddock - Townline Road Line |
| Point of interconnection | Paddock - Townline Road 138kV Line |
| County | Rock |
| State | WI |
| Voltage | 138 kV |
| Capacity | 65 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2023-08-11 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rock, WI: 26 requests in the MISO queue, 15 active totaling 2,594.1 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | American Transmission Co. |
|---|---|
| Cluster | DPP-2019 East (ATC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: In Service |
| Queue date | 2019-04-29 |
| Interconnection agreement date | 2022-06-16 |
| Operational date | 2023-08-11 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.