MISO request J1139

MISO queue ID J1139

Queue request J1139 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Champaign County, IL, according to Berkeley Lab’s queue data file. The filing names Sidney Substation Bus as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2023.

Queue IDJ1139
Project nameNot reported
Status (as published)Active
SubstationSidney Substation Bus
Point of interconnectionSidney Substation 138 kV Bus
CountyChampaign
StateIL
Voltage138 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Champaign, IL: 15 requests in the MISO queue, 8 active totaling 1,264.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2018-APR Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2018-03-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.