MISO request J1063
MISO queue ID J1063
Queue request J1063 was listed in the MISO interconnection queue at the end of 2025 as a 195 MW solar project in Clinton County, IN, according to Berkeley Lab’s queue data file. The filing names New London - Frankfort Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2022.
| Queue ID | J1063 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | New London - Frankfort Line Tap |
| Point of interconnection | New London - Frankfort 230kV Line Tap |
| County | Clinton |
| State | IN |
| Voltage | 230 kV |
| Capacity | 195 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2022-08-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Clinton, IN: 19 requests in the MISO queue, 2 active totaling 375 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | DUKE ENERGY INDIANA |
|---|---|
| Cluster | DPP-2018-APR Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2018-03-12 |
| Interconnection agreement date | 2022-03-09 |
| Operational date | 2024-05-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.