Queue request J1055 was listed in the MISO interconnection queue at the end of 2025 as a 144 MW wind project in Mason County, IL, according to Berkeley Lab’s queue data file. The filing names Mason Substation Bus as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 15, 2020.
| Queue ID | J1055 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Mason Substation Bus |
| Point of interconnection | Mason Substation 138 kV Bus |
| County | Mason |
| State | IL |
| Voltage | 138 kV |
| Capacity | 144 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2020-10-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mason, IL: 17 requests in the MISO queue, 8 active totaling 1,432.7 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2018-APR Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: In Service |
| Queue date | 2018-03-12 |
| Interconnection agreement date | 2021-11-13 |
| Operational date | 2020-10-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.