Substation Scout

MISO request J089

MISO queue ID J089

Queue request J089 was listed in the MISO interconnection queue at the end of 2025 as a 447 MW coal project in Warrick County, IN, according to Berkeley Lab’s queue data file. The filing names Vectren Culley substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2012.

Queue IDJ089
Project nameNot reported
Status (as published)Operational
SubstationVectren Culley substation
Point of interconnectionVectren Culley 138 kV substation
CountyWarrick
StateIN
Voltage138 kV
Capacity447 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2012-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Warrick, IN: 2 requests in the MISO queue, 2 active totaling 547 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-NOV
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2009-10-05
Interconnection agreement date2011-01-26
Operational date2012-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.