Substation Scout

MISO request J043

MISO queue ID J043

Queue request J043 was listed in the MISO interconnection queue at the end of 2025 as a 3.2 MW project in Macomb County, MI, according to Berkeley Lab’s queue data file. The filing names Carbon Tap - Connecting to ITC at Jewel, St. Clair & Spokane substations as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2010.

Queue IDJ043
Project nameNot reported
Status (as published)Operational
SubstationCarbon Tap - Connecting to ITC at Jewel, St. Clair & Spokane substations
Point of interconnectionCarbon Tap 120 kV - Connecting to ITC at Jewel, St. Clair & Spokane substations
CountyMacomb
StateMI
Voltage120 kV
Capacity3.2 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2010-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Macomb, MI: 7 requests in the MISO queue, 6 active totaling 282.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-JUL MI
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2009-05-11
Interconnection agreement date2010-08-24
Operational date2010-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.