MISO request G826
MISO queue ID G826
Queue request G826 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Jackson County, MN, according to Berkeley Lab’s queue data file. The filing names Xcel Lakefield Generation SW - Lakefield Junction as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 15, 2010.
| Queue ID | G826 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Xcel Lakefield Generation SW - Lakefield Junction |
| Point of interconnection | Xcel Lakefield Generation SW - Lakefield Junction 345kV |
| County | Jackson |
| State | MN |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2010-08-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jackson, MN: 29 requests in the MISO queue, 10 active totaling 837 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2012-AUG West |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | DPP - SIS |
| Queue date | 2007-07-16 |
| Interconnection agreement date | 2014-12-17 |
| Operational date | 2010-08-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.