MISO request G573

MISO queue ID G573

Queue request G573 was listed in the MISO interconnection queue at the end of 2025 as a 80 MW wind project in Franklin County, IA, according to Berkeley Lab’s queue data file. The filing names Franklin Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDG573
Project nameNot reported
Status (as published)Operational
SubstationFranklin Substation
Point of interconnectionFranklin 161 kV Substation
CountyFranklin
StateIA
Voltage161 kV
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Franklin Substation substation: 3 requests in the MISO queue, 3 active totaling 200 MW.

Queue IDProjectMWResourceStatus
G574Not reported80WindOperational
G575Not reported40WindOperational

Franklin, IA: 24 requests in the MISO queue, 12 active totaling 1,618 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterCS5
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2005-12-09
Interconnection agreement date2012-05-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.