Queue request G535 was listed in the MISO interconnection queue at the end of 2025 as a 16 MW coal project in Fulton County, IL, according to Berkeley Lab’s queue data file. The filing names Duck Creek Power Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2008.

Queue IDG535
Project nameNot reported
Status (as published)Operational
SubstationDuck Creek Power Station
Point of interconnectionDuck Creek Power Station
CountyFulton
StateIL
VoltageNot reported
Capacity16 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2008-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fulton, IL: 17 requests in the MISO queue, 9 active totaling 1,790.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG535 G535
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2005-07-15
Interconnection agreement date2006-12-21
Operational date2008-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first