MISO queue ID G526

Queue request G526 was listed in the MISO interconnection queue at the end of 2025 as a 52 MW wind project in Huron County, MI, according to Berkeley Lab’s queue data file. The filing names Cosmo Tap - Bad Axe - Arrowhead as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2010.

Queue IDG526
Project nameNot reported
Status (as published)Operational
SubstationCosmo Tap - Bad Axe - Arrowhead
Point of interconnectionCosmo Tap - Bad Axe - Arrowhead 120kV
CountyHuron
StateMI
Voltage120 kV
Capacity52 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2010-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Huron, MI: 41 requests in the MISO queue, 29 active totaling 4,917.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2005-06-06
Interconnection agreement date2007-07-03
Operational date2010-05-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first