MISO request G521

MISO queue ID G521

Queue request G521 was listed in the MISO interconnection queue at the end of 2025 as a 30 MW nuclear project in Ottawa County, OH, according to Berkeley Lab’s queue data file. The filing names FE Davis Besse 345 Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2010.

Queue IDG521
Project nameNot reported
Status (as published)Operational
SubstationFE Davis Besse 345 Substation
Point of interconnectionFE Davis Besse 345 Substation
CountyOttawa
StateOH
VoltageNot reported
Capacity30 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2010-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

FE Davis Besse 345 Substation substation: 2 requests in the MISO queue, 1 active totaling 30 MW.

Queue IDProjectMWResourceStatus
G642Not reported14NuclearWithdrawn

Ottawa, OH: 2 requests in the MISO queue, 1 active totaling 30 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2005-05-27
Interconnection agreement date2006-03-10
Operational date2010-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.