Substation Scout

MISO request G503

MISO queue ID G503

Queue request G503 was listed in the MISO interconnection queue at the end of 2025 as a 158 MW wind project in Huron County, MI, according to Berkeley Lab’s queue data file. The filing names Sanduskey - Wyatt as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2008.

Queue IDG503
Project nameNot reported
Status (as published)Operational
SubstationSanduskey - Wyatt
Point of interconnectionSanduskey - Wyatt 120 kV
CountyHuron
StateMI
Voltage120 kV
Capacity158 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2008-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Huron, MI: 41 requests in the MISO queue, 29 active totaling 4,917.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2005-03-14
Interconnection agreement date2008-01-08
Operational date2008-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first