MISO request G431

MISO queue ID G431

Queue request G431 was listed in the MISO interconnection queue at the end of 2025 as a 420 MW gas project in Knox County, IN, according to Berkeley Lab’s queue data file. The filing names Edwardsport Gen Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2007.

Queue IDG431
Project nameNot reported
Status (as published)Operational
SubstationEdwardsport Gen Station
Point of interconnectionEdwardsport Gen Station
CountyKnox
StateIN
VoltageNot reported
Capacity420 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2007-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Knox, IN: 23 requests in the MISO queue, 14 active totaling 2,010 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2004-06-14
Interconnection agreement date2007-07-09
Operational date2007-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.