Substation Scout

MISO request G380

MISO queue ID G380

Queue request G380 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Pierce County, ND, according to Berkeley Lab’s queue data file. The filing names Rugby Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2005.

Queue IDG380
Project nameNot reported
Status (as published)Operational
SubstationRugby Substation
Point of interconnectionRugby 115kV Substation
CountyPierce
StateND
Voltage115 kV
Capacity150 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2005-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pierce, ND: 1 request in the MISO queue, 1 active totaling 150 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG380 G380
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-11-21
Interconnection agreement date2006-04-11
Operational date2005-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first