MISO request G347

MISO queue ID G347

Queue request G347 was listed in the MISO interconnection queue at the end of 2025 as a 15 MW project in MI, according to Berkeley Lab’s queue data file. The filing names Armory Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDG347
Project nameNot reported
Status (as published)Operational
SubstationArmory Substation
Point of interconnectionArmory Substation
CountyNot reported
StateMI
VoltageNot reported
Capacity15 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG347 G347
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-06-01
Interconnection agreement date2003-09-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.