Substation Scout

MISO request G300

MISO queue ID G300

Queue request G300 was listed in the MISO interconnection queue at the end of 2025 as a 6 MW project in Jackson County, IA, according to Berkeley Lab’s queue data file. The filing names Maquoketa Municipal as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 31, 2007.

Queue IDG300
Project nameNot reported
Status (as published)Operational
SubstationMaquoketa Municipal
Point of interconnectionMaquoketa Municipal 34.5kV
CountyJackson
StateIA
Voltage34.5 kV
Capacity6 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2007-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jackson, IA: 2 requests in the MISO queue, 1 active totaling 6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG300 G300
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-02-21
Interconnection agreement date2003-08-14
Operational date2007-05-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.