MISO request G256

MISO queue ID G256

Queue request G256 was listed in the MISO interconnection queue at the end of 2025 as a 45 MW gas project in Dawson County, MT, according to Berkeley Lab’s queue data file. The filing names Glendive Turbine Jct Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of February 1, 2003.

Queue IDG256
Project nameNot reported
Status (as published)Operational
SubstationGlendive Turbine Jct Substation
Point of interconnectionGlendive Turbine Jct Substation
CountyDawson
StateMT
VoltageNot reported
Capacity45 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2003-02-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dawson, MT: 2 requests in the MISO queue, 2 active totaling 47 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2002-09-20
Interconnection agreement date2003-06-18
Operational date2003-02-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.