MISO request G218

MISO queue ID G218

Queue request G218 was listed in the MISO interconnection queue at the end of 2025 as a 750 MW coal project in Trimble County, KY, according to Berkeley Lab’s queue data file. The filing names Trimble Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 30, 2006.

Queue IDG218
Project nameNot reported
Status (as published)Operational
SubstationTrimble Substation
Point of interconnectionTrimble Substation
CountyTrimble
StateKY
VoltageNot reported
Capacity750 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2006-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Trimble, KY: 7 requests in the MISO queue, 7 active totaling 1,794 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG218 G218
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2002-04-10
Interconnection agreement date2004-04-12
Operational date2006-06-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.