Substation Scout

MISO request G058

MISO queue ID G058

Queue request G058 was listed in the MISO interconnection queue at the end of 2025 as a 3 MW project in Grant County, SD, according to Berkeley Lab’s queue data file. The filing names Valley Queen as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2001.

Queue IDG058
Project nameNot reported
Status (as published)Operational
SubstationValley Queen
Point of interconnectionValley Queen 12.5kV
CountyGrant
StateSD
Voltage12.5 kV
Capacity3 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2001-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grant, SD: 24 requests in the MISO queue, 6 active totaling 856.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2000-09-08
Operational date2001-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first