Queue request E291 was listed in the MISO interconnection queue at the end of 2025 as a 27 MW hydro project in TX, according to Berkeley Lab’s queue data file. The filing names Rich substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2016.

Queue IDE291
Project nameNot reported
Status (as published)Active
SubstationRich substation
Point of interconnectionRich 138 kV substation
CountyNot reported
StateTX
Voltage138 kV
Capacity27 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2016-01-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2012-05-15
Interconnection agreement date2013-10-22
Operational date2020-07-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first