Bluejacket Solar

MISO queue ID E0053

Bluejacket Solar (E0053) was listed in the MISO interconnection queue at the end of 2025 as a 204.9 MW solar project in Bureau County, IL, according to Berkeley Lab’s queue data file. The filing names Bureau-Princeton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2028.

Queue IDE0053
Project nameBluejacket Solar
Status (as published)Active
SubstationBureau-Princeton
Point of interconnectionBureau-Princeton 138kV
CountyBureau
StateIL
Voltage138 kV
Capacity204.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bureau, IL: 4 requests in the MISO queue, 3 active totaling 552.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHoosier Energy
DeveloperHoosier Energy
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-11-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.