MISO request E0034
MISO queue ID E0034
Queue request E0034 was listed in the MISO interconnection queue at the end of 2025 as a 265 MW gas project in Brookings County, SD, according to Berkeley Lab’s queue data file. The filing names Brookings County as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2027.
| Queue ID | E0034 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Brookings County |
| Point of interconnection | Brookings County |
| County | Brookings |
| State | SD |
| Voltage | Not reported |
| Capacity | 265 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2027-11-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Brookings, SD: 14 requests in the MISO queue, 5 active totaling 1,443 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Basin Electric Power Cooperative |
|---|---|
| Developer | Basin Electric Power Cooperative |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Active; Post GIA Status: Not started |
| Queue date | 2025-08-12 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.