Substation Scout

MISO request E0034

MISO queue ID E0034

Queue request E0034 was listed in the MISO interconnection queue at the end of 2025 as a 265 MW gas project in Brookings County, SD, according to Berkeley Lab’s queue data file. The filing names Brookings County as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2027.

Queue IDE0034
Project nameNot reported
Status (as published)Active
SubstationBrookings County
Point of interconnectionBrookings County
CountyBrookings
StateSD
VoltageNot reported
Capacity265 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Brookings, SD: 14 requests in the MISO queue, 5 active totaling 1,443 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityBasin Electric Power Cooperative
DeveloperBasin Electric Power Cooperative
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.