Wright, MN interconnection queue

4 active projects totaling 108.2 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
108.2active MW
9total filed
Queue IDProjectkVMWResourceStatus
G903 Not reported n/r 2,000 Wind Withdrawn
G899 Not reported 345 1,000 Wind Withdrawn
G900 Not reported 345 1,000 Wind Withdrawn
J1446 Not reported 115 150 Battery Withdrawn
J2092 Not reported n/r 100 Wind Withdrawn
G929 Not reported n/r 60.8 Nuclear Operational
J020 Not reported n/r 24.4 Other Operational
G725 Not reported n/r 13 Nuclear Operational
G428 Not reported n/r 10 Nuclear Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.