Woodbury, IA interconnection queue

1 active project totaling 30 MW in the MISO queue, plus 6 with terminal status (shown grayed).

1active projects
30active MW
7total filed
Queue IDProjectkVMWResourceStatus
J3088 Not reported n/r 300 Hybrid Withdrawn
J358 Not reported n/r 280 Coal Withdrawn
J359 Not reported n/r 232 Gas Withdrawn
J357 Not reported n/r 135 Coal Withdrawn
J2352 Not reported 345 118 Wind Withdrawn
J253 Not reported 69 48.3 Wind Withdrawn
J279 Not reported 345 30 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.