Winnebago, IL interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G902 | Not reported | 345 | 1,500 | Wind | Withdrawn |
| G901 | Not reported | 345 | 600 | Wind | Withdrawn |
| J2324 | Not reported | 69 | 35 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner