Winnebago, IA interconnection queue
4 active projects totaling 919.8 MW in the MISO queue, plus 3 with terminal status (shown grayed).
4active projects
919.8active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3798 | Not reported | 345 | 320 | Wind | Active |
| G695 | Not reported | 161 | 200 | Wind | Withdrawn |
| J3849 | Not reported | 345 | 200 | Wind | Active |
| J495 | Not reported | 345 | 200 | Wind | Operational |
| J3157 | Not reported | n/r | 199.8 | Wind | Active |
| G104 | Not reported | n/r | 118 | Other | Withdrawn |
| G121 | Not reported | n/r | 6 | Other | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.