Substation Scout

Winn Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1868 Not reported 115 260 Solar Withdrawn
J2580 Not reported 230 100 Solar Withdrawn
J3625 Not reported 115 82 Hybrid Withdrawn
J1869 Not reported 115 78 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.