Substation Scout

Wilkin, MN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2492 Not reported 230 300 Battery Withdrawn
J3956 Not reported 230 240 Wind Withdrawn
G913 Not reported 230 201 Wind Withdrawn
H031 Not reported 230 160 Wind Withdrawn
J035 Not reported 41.6 4.9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.