Substation Scout

Whiteside, IL interconnection queue

1 active project totaling 300 MW in the MISO queue.

1active projects
300active MW
1total filed
Queue IDProjectkVMWResourceStatus
J2556 Not reported 345 300 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first