Substation Scout

West Carroll Parish, LA interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
150active MW
4total filed
Queue IDProjectkVMWResourceStatus
J4143 Not reported n/r 150 Solar Active
J2765 Not reported 115 100 Hybrid Withdrawn
J2804 Not reported 115 100 Hybrid Withdrawn
J1574 Not reported 115 99 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.