West Carroll Parish, LA interconnection queue
1 active project totaling 150 MW in the MISO queue, plus 3 with terminal status (shown grayed).
1active projects
150active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4143 | Not reported | n/r | 150 | Solar | Active |
| J2765 | Not reported | 115 | 100 | Hybrid | Withdrawn |
| J2804 | Not reported | 115 | 100 | Hybrid | Withdrawn |
| J1574 | Not reported | 115 | 99 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.