Substation Scout

Webster Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 9 with terminal status (shown grayed).

0active projects
0active MW
9total filed
Queue IDProjectkVMWResourceStatus
J3032 Not reported n/r 500 Solar Withdrawn
J2508 Not reported 345 300 Solar Withdrawn
J2348 Not reported 115 225 Solar Withdrawn
J3319 Not reported n/r 150 Hybrid Withdrawn
J4108 Not reported n/r 150 Battery Withdrawn
J2943 Not reported 115 140 Battery Withdrawn
J2448 Not reported 115 100 Solar Withdrawn
J2632 Not reported 115 100 Solar Withdrawn
J3221 Not reported n/r 49 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.