Substation Scout

Wayne, IL interconnection queue

1 active project totaling 21.4 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
21.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3321 Not reported n/r 200 Solar Withdrawn
J3993 Not reported n/r 21.4 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first