Washington, MN interconnection queue
2 active projects totaling 100 MW in the MISO queue, plus 3 with terminal status (shown grayed).
2active projects
100active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G416 | Not reported | n/r | 300 | Gas | Withdrawn |
| J3312 | Not reported | n/r | 100 | Battery | Withdrawn |
| J2879 | Not reported | n/r | 80 | Battery | Active |
| G235 | Not reported | n/r | 79 | Other | Withdrawn |
| G170 | Not reported | n/r | 20 | Coal | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.