6 active projects totaling 2,700 MW in the MISO queue, plus 9 with terminal status (shown grayed).

6active projects
2,700active MW
15total filed
Queue IDProjectkVMWResourceStatus
IP14 Not reported n/r 1,500 Coal Operational
IP11 Not reported n/r 500 Other Withdrawn
J2690 Not reported n/r 500 Hybrid Active
J1216 Not reported 138 250 Solar Active
J2422 Not reported n/r 200 Battery Withdrawn
J2463 Not reported n/r 200 Solar Withdrawn
J1225 Not reported n/r 160 Solar Withdrawn
G495 Not reported n/r 150 Coal Operational
J1094 Not reported 138 150 Solar Active
J1301 Not reported 138 150 Solar Withdrawn
J3316 Not reported 138 150 Battery Active
J3410 Not reported 345 120 Solar Withdrawn
J3013 Not reported n/r 100 Hybrid Withdrawn
J1035 Not reported 138 75 Solar Withdrawn
J797 Not reported 138 70 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first